Monday, January 19, 2009

Shelf 1/3 built

Once it is built I will unload caulk, wood fill and paint or stain, unsure yet what the final decision is going to be,

The reason I am loading it as we go is that I have conference tables FULL of books, games, etc. to go on this unit and by having everything put on it I am building so it fits all my needs.

Today was peg day..Makes it go so much easier and seems solid.

LINDA has been a life saver with this project!!!

I need to run I leave for Jacksonville in the morning. My first of two visits to Hope Haven Clinic. It is a very long drive with the two little guys so wish me luck! No lap top, two much responsibility alone with Lucas and Jordan so I will post when we return.